Case Studies

Ace Hardware | Case Study | Post Frame Advantage

Ace Hardware
Shirking more conventional methods of construction, Ace Hardware of Wautoma, WI, selected post frame as the material component to rebuild a structure that had been destroyed by fire. Duane Detjens, of TCP Construction and the owner of the construction site, recommended a post-frame building to the new owners.

More

Autobahn | Case Study | Post Frame Advantage

AutoMotorPlex Clubhouse
Lester Buildings, LLC of Lester Prairie, MN built the AutoMotorPlex Clubhouse for Bruno Silikowski of AutoMotorPlex, LLC. This is a clubhouse for members who have purchased a garage condo and are motorsport enthusiasts.

More

Complete Footcare | Case Study | Post Frame Advantage

Complete Footcare Medical Facility 
Fingerlakes Construction Company of Clyde, NY erected the Complete Footcare facility, built for Dr. Carrie O'Neill. The facility is a medical building for podiatry services. The unique design of the dormers and valleys give it a lower profile look. The stucco exterior adds to the low maintenance and appealing décor.

More

Grace Baptist Church | Case Study | Post Frame Advantage

Grace Baptist Church 
The use of brick and horizontal HardiPlank on the "curb appeal" side and economical hi-rib steel on less visible sides was a way to save money but not compromise the beauty of the building. The entrance is accented by a double wide drive-through canopy for easy drop off and pick up in poor weather.

More

Heath Retail Center | Case Study | Post Frame Advantage

Heath Retail Center 
In January 2008 WC Buildings, LLC of Newark, OH undertook an ambitious building project in Heath, OH for Keinath & Heatwolfe, LLC. The assignment was to construct a four unit commercial building – a strip mall - under the name Heath Retail Center.

More

High Rock Landing | Case Study | Post Frame Advantage

High Rock Landings Retail Mall
This retail facility, High Rock Landings, was constructed with post frame by the Morton Buildings, Inc. branch office in Lexington, NC. The customer had compared post frame with metal frame, but steel framing did not offer the details desired by the property developer.

More

Lawrence Township Fire Station | Case Study | Post Frame Advantage

Lawrence Township Fire Station
Lawrence Township, MI needed to retrofit their old brick and block fire station to house a new fire engine. “Winter was rapidly approaching,” recalled builder Glen Thomsen. Thomsen considered using block and steel. But, given the cold weather and the longer building processes of both, the project would have taken an estimated six to eight weeks longer than with post frame.

More

Retail Home Furnishing | Case Study | Post Frame Advantage

Retail Home Furnishing Business
When the owners of Oak Creations of Millersport, Ohio needed to expand to a new location, they chose post-frame construction after an evaluation of all options. In the end, the transition was huge success. “Every day we have so many compliments on the exterior appearance of this post-frame building and its design,” says co-owner, Rosann Franks.

More

Weathering the Storm Katrina | Case Study | Post Frame Advantage

Weathering The Storm
In the wake of Hurricanes Katrina and Rita, the National Frame Building Association (NFBA) reported that post-frame buildings in the southern coastal states stood tall amidst the rubble of other buildings nearby. The reports were no surprise to those familiar with post-frame construction who know that post-frame performs exceptionally well under tremendous wind, snow and seismic loads.

More

Find a Post-Frame Builder

Enter your zip code to receive a list of post-frame builders in your area.

Sign Up for Our E-Newsletter

Post-Frame Advantage